• Register
  • Login
  • Subscribe
  • Contact Us

Design & Construction of Virgin Coconut Oil Processing Facility

KoreaTenders notice for Design & Construction of Virgin Coconut Oil Processing Facility. The reference ID of the tender is 64752711 and it is closing on 07 Apr 2022.

Tender Details

  • Country: South Korea
  • Summary: Design & Construction of Virgin Coconut Oil Processing Facility
  • KRT Ref No: 64752711
  • Deadline: 07 Apr 2022
  • Financier: Other Funding Agencies
  • Purchaser Ownership: Government
  • Tender Value: Refer Document
  • Notice Type: Tender
  • Document Ref. No.:
  • Purchaser's Detail:
    Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details. Login to see full purchaser details.
  • Description:
  • Request for proposals are invited for Design & Construction of Virgin Coconut Oil Processing Facility (San Teodoro) And Calamansi Processing Facility (Oriental Mindoro) PHILIPPINES The Scope of Work and Activities Include; Design Stage - Activities & Outputs; 1. Site Inspection; Topographic Survey; Geotechnical/Geological Investigation; Foundation Analysis and Environment Impact Assessment Studies 2. Conception and Preparation of Preliminary Architectural and Engineering Plan Based on the Msmes Reference Drawings (Refer to Annex 1); Fda Guidelines on Premises (Refer to Annex 2); Fda Guidelines on Machinery (Refer to Annex 3); Doh Good Manufacturing Practices (Refer to Annex and Additional Information on Machines (Refer to Annex 6) 3. Presentation of Draft Design to the Pbsp Technical Team/Gggi within 30 Working Days after Contract Signing. The Detailed Design should have the following Components; (Architectural Drawings; Structural Drawings; Plumbing Drawings; Electrical Drawings; Mechanical Drawings and Design Drawings) at the Bare Minimum. 4. Revision of Initial Draft Incorporating Comments from the Pbsp Technical Team/Gggi 5. Preparation of Detailed Unit Price Analysis and Bills of Quantities 6. Preparation of S-Curve/Construction Schedule/Proposed Gannt Chart 7. Presentation of the Final Design to Pbsp Technical Team/Gggi. Final Output of the Plans shall be Signed and Sealed by Licensed Engineers for each Particular Component. Reproduction of Plans Other than for Permits and Licensing Purposes. 8. Submission of the Final Design to Obo for Review and Approval. 9. Securing the Building Permit from Obo 10. Assist Gggi/Beneficiary to Secure the Occupancy Permit from Obo Adherence to Design Codes and Standards; The Contractor shall Coordinate and Report to the Office of the Building Official (Obo) for Uniformity and Cohesiveness in the Preparation of Related Documents, Consistent with the Latest Edition of National Building Code of the Philippines and its Implementing Rules and Regulations All Reports and Other Related Documents Prepared by the Contractor shall be in a Format Agreed and Accepted by the Obo. Required Outputs from Design Stage; The Expected Deliverables from the Contractor Include; A) Site Inspection Report B) Geo-Technical Investigation Report C) Topographic Survey Report D) Environment and Social Impact Assessment Report E) Approved β€œfor Construction” Drawings F) Approved Technical Specifications G) Detailed Engineering Plans H) Design Report I) β€œas Built” Plans J) Building Permit K) Occupancy Permit Construction Stage - Activities & Outputs Construction Activities; The Contractor is Expected to Undertake the following Activities/Works, (Refer to Annex 5 for Details); 1. Site Development 2. Concrete Framing 3. Floor Slab/Masonry and Roofing 4. Plastering, Carpentry and Fabrication Works 5. Painting Works, Installation of Windows, Doors and All Fixtures 6. Commissioning, Closure and Handing Over
  • Documents:

 Tender Notice

If you are registered member, kindly login to view full details of this tender notice:

CLICK HERE TO LOGIN

Design & Construction of Virgin Coconut Oil Processing Facility - Korea Tender

The GLOBAL GREEN GROWTH INSTITUTE, a Government sector organization in South Korea, has announced a new tender for Design & Construction of Virgin Coconut Oil Processing Facility. This tender is published on KoreaTenders under KRT Ref No: 64752711 and is categorized as a Tender. Interested and eligible suppliers are invited to participate by reviewing the tender documents and submitting their bids before the deadline on 2022-04-07.

The estimated tender value is Refer Document, and full details, including technical specifications and submission requirements, are provided in the official tender documents. Ensure all submissions meet the criteria outlined to be considered for evaluation.

KoreaTenders Features

KoreaTenders Features

Fresh and verified Tenders from Korea. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.

  • 1,000+ Tenders
  • Verified Tenders Only
  • New Tenders Every Day
  • Tenders Result Data
  • Archive & Historical Tenders Access
  • Consultants for RFI/RFP/RFQ
  • Tender Notifications & Alerts
  • Search, Sort, and Filter Tenders
  • Bidding Assistance & Consulting
  • Customer Support
  • Publish your Tenders
  • Export data to Excel
  • API for Tender Data
  • Tender Documents
Tender Experts

Get A Call From Tender Experts

Fill out the form below and you will receive a call from us within 24 hours.

Thank You for Contacting KoreaTenders !!
Email Id is already exist !!
Captcha Image
Invalid Captcha !

Get FREE SAMPLE TENDERS from Korea in your email inbox.

  Chat with us